about
Located within the Foothills Campus of Colorado State University, BioMARC operates space within two buildings (Site I and Site II).

Each site (I and II) is approximately 9,000 sq. ft. of organized manufacturing space comprised of a variety of classified and non-classified ISO controlled spaces, including BSL-2 and BSL-3 suites, quality control laboratory and support areas, along with document storage and office space. The following summarizes BioMARC manufacturing capacity:

Six (6) cGMP Suites

  • Two BSL-3/cGMP ISO 7 Clean Room Suites with ISO 5 Biosafety Cabinets.

The BSL-3 suite includes:

    • GMP manufacturing cleanrooms
    • Gowning and material transfer airlocks
    • Shower-out facilities
    • Material staging area
    • BSL-3 access positive pressure ante-rooms
  • Three BSL-2/cGMP ISO 7 Clean Room Suites with ISO 5 Biosafety Cabinets.

       The BSL-2 suite includes:

    • Manufacturing cleanrooms
    • QC Analytical laboratory
    • Support (quarantine/released material storage, solution and glassware prep)
    • Gowning and material transfer ante-rooms
  • One BSL-2 cGMP ISO 7 Clean Room for Final Fill.
Three (3) Quality Control Laboratories

Assortment of cGMP Support Rooms
(Quarantine/Released Goods, Media Prep. and Glassware, etc.)


Two (2) Development Laboratories (including small animal R&D space
          • One BSL-3 and one BSL-2.
          • One BSL-3 development lab and one BSL-2.

Contact Information

Dennis Pierro, PhD                                                     
Director                                                                             
dennis.pierro@colostate.edu
(970) 491-8954
        
Background